MAX134 Evaluation Kit
• MAX134 EV kit (USB cable included)
• Three AA batteries
• User-supplied Windows XP, Windows Vista, or
• Test leads with standard banana plug connectors
• Input-voltage source, current source, or resistor to be
Note: In the following sections, software-related items are
identified by bolding. Text in bold refers to items directly
from the EV kit software. Text in bold_and_underlined refers
to items from the Windows operating system.
Warning:_ For safety reasons, the input voltage is limited
to 40V (max). Be sure to read the information contained in
the Multiple Grounds section before connecting test equip-
ment.
Note:_Batteries must be used to power the MAX134 EV kit.
Replacing the batteries with an external power supply may
create a ground loop that could damage the board.
Table_1._Jumper_Functions_(JU1–JU6)
*Default position.
4_ _ _______________________________________________________________________________________
Windows 7 PC with a spare USB port
measured
UNINSTALL.INI
JUMPER
134MAXQ.ZIP
INSTALL.EXE
MAX134.EXE
JU1
JU2
JU3
JU4
JU5
JU6
FILE
SHUNT_POSITION
Installs the EV kit on your computer
Application program
Uninstalls the EV kit software
MAXQ2000 source code
MAX134 EV Kit Files
Open
Open
Open
Open
1-2*
1-2*
1-2*
1-2*
1-2*
1-2*
2-3
2-3
Required Equipment
DESCRIPTION
Quick Start
MAX134 VREF = 545mV
MAX134 VREF is determined by potentiometer R4
Normal battery connection
Place an ammeter across JU2 to measure battery current
Configuration for 3 AA batteries (MAX828 input to BATT+)
Configuration for 9V battery (MAX828 disconnected)
Configuration for 3 AA batteries (V- to MAX828 output)
Configuration for 9V battery (V- connected to BATT-)
Normal operation
Remove when measuring battery current
Normal operation
Remove when measuring battery current
Procedure
The EV kit is fully assembled and tested. Operation in each
of the functions (VOLTS, 400mV, KOhms, or 400mA) can
be verified without connecting to a PC. Follow the steps
below to verify board operation:
1) Verify that the power switch (SW2) is in the off position
2) Verify that all jumpers are in their default positions, as
3) Place the function selection switch (SW1) in the 400mA
4) Slide power switch SW2 to the on position.
5) The LCD display should indicate 000.0.
1) Place the SW1 switch in the VOLTS position.
2) Insert test leads into J1 (VOLTS) and J4 (COM).
3) Connect the leads to a known voltage source
4) The input voltage should appear on the LCD.
1) Place the SW1 switch in the 400mV position.
2) Insert test leads into J2 (400mV/KOhms) and
3) Connect the leads to a known voltage source (±400mV).
4) The input voltage should appear on the LCD.
1) Place the SW1 switch in the KOhms position.
2) Insert test leads into J2 (400mV/KOhms) and J4 (COM).
J4 (COM).
and insert three AA batteries.
listed in Table 1.
position.
(±40V max).
DESCRIPTION
Voltmeter Operation
KOhms Operation
400mV Operation