H3DE-M1 Omron, H3DE-M1 Datasheet - Page 6

Multifunction Timer

H3DE-M1

Manufacturer Part Number
H3DE-M1
Description
Multifunction Timer
Manufacturer
Omron
Datasheet

Specifications of H3DE-M1

Time Range
0.1 - 120 Hr
Height
79mm
Voltage Ac
250V
External Width
22.5mm
Voltage Rating Vdc
30V
Timing Function
Multifunction
External Depth
100mm
Operating Temperature Min
-10°C
H3DE-M/-S
Note: 1. The minimum power reset time is 0.1 s and the minimum signal input time is 0.05 s.
Note: The start input of the H3DE-M1 or H3DE-M2 model is activated by applying a voltage to B1 and A2 terminals.
10
A: ON-delay
B:
Flicker OFF
start
B2:
Flicker ON
start
C:
Signal
ON/OFF-
delay
Operating
Timing Chart
mode
2. The letter “t” in the timing charts stands for the set time and “t–a” means that the period is less than the time set.
The voltage can be applied by turning on the contact between B1 and A1 (Refer to T erminal Arrangement ).
Power (A
Start (B
(see note)
Output relay: NC
15 and 16
(25 and 26)
Output relay: NO
(output indicator)
15 and 18
(25 and 28)
Power indicator
Output relay: NC
15 and 16
(25 and 26)
Output relay: NO
(output indicator)
15 and 18
(25 and 28)
Power (A
Start (B
(see note)
Power indicator
Power (A
Start (B
(see note)
Output relay: NC
15 and 16
(25 and 26)
Output relay: NO
(output indicator)
15 and 18
(25 and 28)
Power (A
Start (B
(see note)
Output relay: NC
15 and 16
(25 and 26)
Output relay: NO
(output indicator)
15 and 18
(25 and 28)
Power indicator
Power indicator
1
1
1
and A
1
1
and A
1
and A
and A
1
and A
1
and A
and A
and A
2
2
)
)
2
2
2
2
)
)
)
)
2
2
)
)
t
t
t
t
t
t
t
t–a
t–a
t–a
t
t
t
t
Timing chart
t–a
t
t
t
t
t
t–a
t–a
t–a
Output
Output
*
Basic operation
Power
Start
Power
Basic operation
Output
Output
Power
*
** Start input is invalid while the Timer is in opera-
Power
Basic operation
*
** Start input is invalid while the Timer is in opera-
Start
*
** Start input is invalid while the Timer is in opera-
Start
Basic operation
Start
*
*
Start input is invalid while the Timer is in opera-
tion.
*
For power-on operation, impose voltage to the
Start input. The Timer starts operating at the
moment the power is turned on.
tion.
For power-on operation, impose voltage to the
Start input. The Timer starts operating at the
moment the power is turned on.
tion.
For power-on operation, impose voltage to the
Start input. The Timer starts operating at the
moment the power is turned on.
tion.
**
**
t
**
*
t
t
t
t
t
t
t
H3DE-M/-S
t
t
t
t
t

Related parts for H3DE-M1