SI2493-C-FS Silicon Laboratories Inc, SI2493-C-FS Datasheet - Page 137

IC ISOMODEM SYSTEM-SIDE 16SOIC

SI2493-C-FS

Manufacturer Part Number
SI2493-C-FS
Description
IC ISOMODEM SYSTEM-SIDE 16SOIC
Manufacturer
Silicon Laboratories Inc
Datasheets

Specifications of SI2493-C-FS

Mfg Application Notes
SI2493/57/34/15/04, Appl Note AN93
Data Format
V.21, V.22, V.23, V.29, V.32, V.34, V.90, V.92, Bell 103, Bell 212A
Baud Rates
56k
Interface
UART
Voltage - Supply
3 V ~ 3.6 V
Mounting Type
Surface Mount
Package / Case
16-SOIC (3.9mm Width)
Lead Free Status / RoHS Status
Lead free / RoHS Compliant

Available stocks

Company
Part Number
Manufacturer
Quantity
Price
Part Number:
SI2493-C-FSR
Manufacturer:
DY
Quantity:
8 623
Part Number:
SI2493-C-FSR
Manufacturer:
SIEMENS/西门子
Quantity:
20 000
3.5.19.3.1. Emissions/Immunity
The Si2493/57/34/15/04 chipset and recommended
DAA schematic are fully compliant with and pass all
international electromagnetic emissions and conducted
immunity tests (includes FCC part 15,68; EN50082-1).
Careful attention to the Si2493/57/34/15/04 bill of
materials (page 19), schematic (page 18), and layout
guidelines ensure compliance with these international
standards. In designs with difficult layout constraints,
the addition of R12 and R13 to the C8 and C9
recommended
performance on emissions and conducted immunity. For
such designs, a population option for R12 and R13 may
allow additional flexibility for optimization after the
printed circuit board has been completed. Also, under
some layout conditions, C8 and C9 may improve the
immunity to telephone line transients.
1000 Ω @ 100 MHz, 200 mA
1000 Ω @ 100 MHz, 200 mA
C9
C8
capacitors
Figure 26. Circuits that Pass All UL1950 Overvoltage Tests
FB1
FB2
may
improve
modem
RV1
Rev. 0.9
3.5.19.4. Safety
Designs
overcurrent and overvoltage tests for UL1950 3rd
Editions given the addition of a 1.25 A Fuse or PTC, as
shown in Figure 26. In a cost-optimized design, it is
important to remember that compliance to UL1950 does
not always require overvoltage tests. In the design
cycle, it is important to plan ahead and know which
overvoltage tests apply to your system. System level
elements in the construction, such as fire enclosure and
spacing requirements, need to be considered during the
design stages. Consult with your Professional Testing
Agency during the design of your product to determine
which tests apply to your system.
using
Fuse/PTC
1.25 A
the
Si2493/57/34/15/04
RING
AN93
TIP
pass
137
all

Related parts for SI2493-C-FS