20-101-0303 Rabbit Semiconductor, 20-101-0303 Datasheet - Page 114

SMARTSCREEN OP7100 W/TOUCHSCREEN

20-101-0303

Manufacturer Part Number
20-101-0303
Description
SMARTSCREEN OP7100 W/TOUCHSCREEN
Manufacturer
Rabbit Semiconductor
Datasheet

Specifications of 20-101-0303

Display Type
STN - Super-Twisted Nematic
Viewing Area
121.00mm L x 91.00mm W
Backlight
CCFL - White
Dot Pitch
0.36mm x 0.36mm
Dot Pixels
320 x 240 (QVGA)
Interface
Serial
Product
Prototyping Accessories
Processor Type
Z180
Sram
128 KB
Flash
512 KB
Number Of I/os
16
Backup Battery
3 V Lithium Coin Type
Operating Voltage
10 V to 30 V
Power Consumption
4.5 W
Interface Type
Ethernet
Lead Free Status / RoHS Status
Lead free / RoHS Compliant
Display Mode
-
Dot Size
-
Lead Free Status / Rohs Status
Lead free / RoHS Compliant
Other names
20-101-0303
20-101-303
20-101-303
316-1175
Battery Life and Storage Conditions
The battery on the OP7100 will provide approximately 9,000 hours of
backup time for the onboard real-time clock and static RAM. However,
backup time longevity is affected by many factors including the amount of
time the OP7100 is unpowered. Most systems are operated on a continuous
basis, with the battery supplying power to the real-time clock and the
SRAM during power outages and/or during routine maintenance. The time
estimate reflects the shelf life of a lithium battery with occasional use
rather than the ability of the battery to power the circuitry full time.
The battery has a capacity of 265 mA·h. At 25°C, the real-time clock
draws 3 µA when idle, and the 128K SRAM draws 4 µA. If the OP7100
were unpowered 100 percent of the time, the battery would last 32, 000
hours (3.6 years).
To maximize the battery life, the OP7100 should be stored at room
temperature in the factory packaging until field installation. Take care that
the OP7100 is not exposed to extreme temperature, humidity, and/or
contaminants such as dust and chemicals.
To ensure maximum battery shelf life, follow proper storage procedures.
Replacement batteries should be kept sealed in the factory packaging at
room temperature until installation. Protection against environmental
extremes will help maximize battery life.
Replacing the Lithium Battery
The battery is user-replaceable, and is fitted in a battery holder. To replace
the battery, lift up on the spring clip and slide out the old battery. Use only
a Panasonic CR2330 or equivalent replacement battery, and insert it into
the battery holder with the + side facing up.
114 Backup Battery
Note that the SRAM contents and the real-time clock settings
will be lost if the battery is replaced with no power applied to
the OP7100. Therefore, if you do replace the battery with
external power applied to the OP7100, exercise caution since
high voltages are present in the vicinity of T1 on the side of the
printed circuit board opposite to the battery holder.
OP7100

Related parts for 20-101-0303