U3401A-ABA AGILENT TECHNOLOGIES, U3401A-ABA Datasheet - Page 79

no-image

U3401A-ABA

Manufacturer Part Number
U3401A-ABA
Description
English Users And Service Guide 3400
Manufacturer
AGILENT TECHNOLOGIES
Datasheet

Specifications of U3401A-ABA

Rohs Compliant
NA
For Use With
U3400 Series U3401A Dual Display Multimeter
Performance Verification Tests Overview
U3401A User’s and Service Guide
N O TE
Performance Verification Tests
Performance verification tests is an extensive set of tests that are
recommended as an acceptance test when you first receive the instrument.
Use the performance verification test to verify the measurement
performance of the instrument. The performance verification test uses the
instrument’s specifications listed in
Characteristics”.
The performance verification test is recommended as acceptance tests
when you first received the instrument. The acceptance test results should
be compared against the one- year test limits. After acceptance, you should
repeat the performance verification tests at every calibration interval.
If the instrument fails performance verification, adjustment or repair is
required. Contact your local Agilent Service Center for details.
Make sure you have
verification tests.
This test checks the full- scale reading accuracy of the instrument.
DC Voltage Verification Test
1 Connect the calibrator to the front panel Hi and Lo input terminals.
2 Select each function and range in the order shown in
3 Make a measurement and observe the result. Compare measurement
Provide the input shown in
results to the appropriate test limits shown in the
certain to allow for appropriate source settling when using the Fluke
5520A).
read“Test
Considerations”on page 60 before doing the performance
Table 4- 2
Chapter 6
“Specifications and
Table 4-
Performance Test
Table 4-
2. (Be
2.
61
4

Related parts for U3401A-ABA