5384 3M Interconnect Solutions, 5384 Datasheet - Page 2

no-image

5384

Manufacturer Part Number
5384
Description
Manufacturer
3M Interconnect Solutions
Datasheet

Specifications of 5384

Lead Free Status / Rohs Status
Supplier Unconfirmed
A. Prepare Cable According to Standard Procedures
Note:
1. Check to be sure cables fit within cable kit range as shown in Table 1 on cover.
2. Remove cable insulation for length recommended by terminal lug manufacturer; if no information is
B. Install Lugs
1. Clean insulation for approximately 6" using solvent-saturated cloths provided in kit.
2. Install and crimp lugs per manufacturer’s direction. See back page if 3M
3.
C. Install Lug Cover
1. Separate cables and apply mastic strip between and around them, 3.5" (90 mm) from ends of cable
2. Overwrap the mastic with 1 or 2 wraps of vinyl tape (Figure 2).
Figure 1
Figure 2
available, remove for depth of lug barrel.
Bolt lugs together. See Table 1 on cover for maximum bolt length. See Figure 1 for proper bolt/lug arrangement.
insulations (Figure 2). Build mastic to an overall diameter that is greater than the inside diameter of the Lug
Cover. Press cables together and make certain that no void exists between them (Figure 2).
The terminations and grounding components will not be used for non-shielded cable.
Instructions for 5/8 kV Non-Shielded Feeder Cables
������� ���� �� ������� ��� ������
������ ���
����� ���� ����
���� ������ �� ��������
2
���� ��� ���
����� ���
������
����� ���
lugs are used.
78-8126-9102-6-B