Specifications of CV500BC051

Peak Reflow Compatible (260 C)
No
Leaded Process Compatible
No
Lead Free Status / RoHS Status
Contains lead / RoHS non-compliant
Application Precautions
• Communicate between the CPU Unit and Communications Units by exe-
• Up to 20,000 data link send and receive words can be allocated per node
• For details on Controller Link Unit current consumption, refer to Controller
• The CS1W-CLK23, CJ1W-CLK23, and 3G8F7-CLK23-E support up to
• If the total number of data link words is increased, the PLC cycle time and
cuting the SEND(090), RECV(098), and CMND(490) instructions for the
internal logic ports (8 ports max.). Up to eight Controller Link Units can be
connected to a single CPU Unit with unit version 1.2 or later. Perform
exclusive control of the ports using the ladder program when using the
SEND(090), RECV(098), and CMND(490) instructions to perform mes-
sage servicing on multiple networks (Units).
(Unit) when using unit version 1.2 or later. Data of 20,000 words is divided
and refreshed across three CPU Unit cycles. Make sure that the response
time has been considered in the system design. (Data is synchronous for
each node when data is refreshed in the CPU Unit, in the same way as for
earlier versions. If the number of data link words is 12,000 words or less,
the response with earlier unit versions (pre-Ver. 1.2) is exactly the same.)
Link Unit Models and PLCs on page 18. For details on current consump-
tion of each Unit, refer to the operation manual of the PLC that is being
used. For an example of calculating current consumption, refer to
page 20.
4,000 send words per node, but no more than 1,000 send words per node
can be set if any other model of Controller Link Unit or Support Board is
used in the same network.
the communications cycle time will be increased. In that case, observe
the following precautions.
• Check to make sure that it will not cause problems if performance in
• In message communications, extending the communications cycle
responses to external devices is reduced.
time may result in timeout errors waiting for responses.
In that case, lengthen the response monitor time as described below.
SEND, RECV, and CMND instructions:
PLC Programming Devices:
Response monitor time setting area for local node control data.
For details, refer to 6-1 Introduction .
PLC Programming Device Response Timeout setting
For details on settings, refer to the operation manual for the PLC
Programming Device that is being used.