CQM1-CIF01 Omron, CQM1-CIF01 Datasheet - Page 109

no-image

CQM1-CIF01

Manufacturer Part Number
CQM1-CIF01
Description
PERIPHERAL CABLE FOR NEC COMP.
Manufacturer
Omron
Datasheet

Specifications of CQM1-CIF01

Lead Free Status / Rohs Status
Lead free / RoHS Compliant
Test Run Settings
8-1
Displaying the JOG
Operation Settings
Window
Closing the Test Run
Settings Window
Test Run Settings
8-2
88
Test Run Settings
Test Run
1,2,3...
The following allocations are set in the test run settings.
1. On the project tree, select the Position Control Unit to execute the test run.
2. Select Online - Test Run Settings.
3. The Test Run Settings Window will be displayed.
Click the OK Button to reflect the edited settings. Click the Cancel Button to
not reflect the edited settings.
Set the output words and bit numbers to allocate the RUN signals and drive
alarm reset signals. Then, click the Invalid Button of each axis.
displayed to show that the allocation is valid.
The following operations are possible in the test run.
• RUN signal allocation
• Drive alarm reset signal allocation
• Turning ON/OFF the RUN signal for each axis
• Resetting alarms for each axis
• JOG operations
• Direct operations
• Origin searches
Section 8-1
will be

Related parts for CQM1-CIF01